姓名*

公司*

国家*

电话

电子邮件*

您的留言*


Jack-up rigs

Jack-up rigs are used to search for oil and gas deposits down to a maximum water depth of 160 m. Tugboats or special transport vessels tow the rig to its drill location.

vessels

The rig, which can often weigh as much as 30,000 tons, stands on three legs and can be jacked up. The rig is raised and lowered by in average 54 helical planetary gear units connected by pinions on racks. A high transmission ratio in excess of 7,000 and high torque are characteristic for Flender gear units for jack-up rigs.

The jack-up’s short overall operating time of 200 to 300 hours stands in opposite to the required long life service of the gear units. For this reason, Flender gear units for jack-up rigs are carefully constructed according to the special demands of our customers in order to minimize the weight and optimize the capital costs. As a key safety feature of the rig, however, they are subject to the stringent regulations of the classification societies and are designed for the harsh conditions of extreme operating environments.

Flender gear units for jack-up rigs

Your benefits at a glance
Fatigue life resistance: optimized for specific applications
Low capital costs
Extremely reliable and robust
Completely closed against environmental damage
Compact, space-saving design
ABS (or any other classification society) approved design
Suitable for temperatures from -20 °C up to +50 °C
Worldwide service

Applications
Jack-up rigs
Installation vessels

Ask for a free quotation – We are at your disposal

Call us at +39 080.5367090 or send an email to info@tecnicaindustriale.com